Supply, Installation and Maintenance of Park Air and ICOM VHF radios

EXECUTIVE SUMMARY

It is an Installation & Maintenance project awarded to Bayanat Engineering Qatar from Qatar Airways (Hamad international Airport). VHF communication systems are the most widely used to communicate between ATC, Ground Handling and Aircraft.
Major Scope included Supply, installation, testing & commissioning of VHF radios and 10 Years maintenance of Park Air and ICOM Radios installed in the airside vehicles.

The equipment details mention below
1. VHF Air band Transceivers complete with accessories
2. IP based Controllers complete with accessories
3. Controllers-wired type
4. Omni directional Antenna
5. VHF Air band radio-Vehicle mountable
6. VHF Air band radio-Desktop mountable
7. VHF Air band Handheld Radio

PROJECT DETAILS

DESCRIPTION DETAILS
LOCATION Hamad International Airport
PROJECT TYPE Supply, Installation and 10 years Maintenance
APPLICATION Airport wide communications
PROJECT DESCRIPTION Supply, Installation and Maintenance of Park Air (T6TR) and ICom VHF radios (Handheld & Mobile)
Client Qatar Airways/ HIA
Project Start Date July 2017
Project Completion Date On-going (till July 2027)
Main Supplier Park Air Systems Ltd (Parkair Radios)
ICom, Japan (ICom Radios)
Project Status Active

Supply, Installation and Maintenance of VeeLo (ADS-B Transponders)

1. EXECUTIVE SUMMARY

It’s a supply and support project awarded to Bayanat Engineering Qatar by Qatar Airways (Hamad International airport). The main object of this project is to supply, installation and commissioning of Veelo ADS-B Transponders. Also include the preventive and corrective maintenance of transponders. Bayanat Engineering Qatar with his partner SAAB Sensis will provide total quantity of 150 Transponders and installation along with testing and commission of Veelo Transponder is performed by Bayanat Engineering Qatar. Scope of Works includes below mentioned items

Supply, Installation & Maintenance support for the following ADS-B Transponders and related Accessories:
• Vehicle transponder with ADS-B transmitter and GPS receiver – 150 No’s
• Power supply cable with switch to control – Standard 4.6 meter – 150 No’s
• Permanent vehicle mounting accessories – Mounting Bracket – 150 No’s
• Configuration kit for transponder including software CD. – 4 No’s
• Power supply cable with switch to control (medium size) – 9.2m – 50 No’s
• Power supply cable with switch to control (long size) – 15.2m – 50 No’s

PROJECT DETAILS

DESCRIPTION DETAILS
LOCATION Supply, Installation and Maintenance
PROJECT TYPE Supply, Installation and Maintenance
APPLICATION Airport Operations
PROJECT DESCRIPTION Supply, Installation and Maintenance of ADS-B Transponders
Client Qatar Airways/ HIA
Project Start Date July 2017
Project Completion Date On-going (till July 2022)
Main Supplier Saab Sensis Corporation
Project Status Active

Supply and installation of Vaisala meteorological systems at Doha International Airport (DIA)

1. EXECUTIVE SUMMARY
This project was awarded to Bayanat Engineering Qatar by QCAA/QMD. The scope includes the supply & installation of Vaisala-Automatic Weather Observation Systems (AWOS). We installed the AWOS equipment parallel to the runway to monitor the runway weather elements.

Vaisala AWOS System provides aviation meteorological data to the air traffic controllers, Pilots and other people who depend upon the airport weather-related information. It is base over 40 years of experience and excellence in the aviation business and includes field instrumentation/sensors specially designed for aviation purposes. All Vaisala systems and reports for aviation weather observation conform to the International ICAO standards and recommendations, as well as WMO regulations.

Equipment Includes are follows

a) AWOS Wind Masts
b) Runway Visibility Sensors (RVR)
c) Ceilometers (to monitor clouds)
d) Central Data Unit (to collect and manage the data received from sensors)
e) AviMet Weather Monitoring Software

Provision of Shelters Fully Equipped & Relevant Services

PROJECT TYPE : Supply and Installation
APPLICATION : Air Field
PROJECT DESCRIPTION : Supply and installation of airfield shelters for navigation equipment installed at HIA airfield
Client : Selex- ES
Project Status : Completed

Airport Wide Fiber Network For Atc/navaids Services At Hia Western Development Area

Contract Title : AIRPORT WIDE FIBER NETWORK FOR ATC/NAVAIDS SERVICES AT HIA WESTERN DEVELOPMENT AREA

PO No. : UBTJV-SCA-047
BEQ Job No. : Q0096 VN01
Client : UBT JV
Commencement Date : 1-Sep-20
Contract Period : 6 Months
Contract Completion Date : 28-Feb-21
Expected Completion Date : 28-Feb-21

PROJECT SCOPE
BEQ scope of works is design, supply, installation, and commissioning of Fiber network at HIA western expansion area for ATC/Navaids services

Plot Levelling And Sub-base Works At Mukaynis Meteorology Center

Contract Title Plot Levelling and Sub-base works at MUKAYNIS METEOROLOGY CENTER

PO No. 102/2019
BEQ Job No. Q0080
Client Qatar Civil Aviation Authority (QCAA)
Commencement Date 1-Aug-19
Contract Period 1 Month
Contract Completion Date 30-Aug-19
Completion Date 30-Aug-19
Maintenance Support 2 years

PROJECT SCOPE
 Plot Levelling and Sub-base works at MUKAYNIS METEOROLOGY CENTER

Supply & Commissioning Of Thermal Imaging Helmets To Qatar Airways

Contract Title Supply & Commissioning of Thermal Imaging Helmets (5 Nos)

PO No. 754014512
BEQ Job No. Q0098
Client Hamad International Airport (HIA)
Commencement Date 9-Apr-20
Contract Period 3 weeks
Contract Completion Date 30-Apr-20
Completion Date 30-Apr-20
Maintenance Support 1 years

PROJECT SCOPE
scope of work includes supply & commissioning of Thermal Imaging Helmets for Qatar Airways as per below:
 Kuang Chi N901 Thermal Imaging Helmet – Standard Edition: 5 Nos.

Supply & Installation Of Fiber Network And Installation Services For Agl Cms System At Doha International Airport (DIA)

Contract Title Design, Supply & Installation of Fiber Network, and installation services for AGL CMS (Aeronautical ground lighting Control & Monitoring system) at Doha International Airport (DIA)

PO No. 4415178571
BEQ Job No. Q00102
Client HONEYWELL
Commencement Date 22-June-2020
Contract Period 3 months
Contract Completion Date 22-Sep-20
Completion Date 22-Sep-20

SCOPE OF WORKS
1. Design, Supply & Installation of outdoor FIber network for AGL CMS system at DIA
2. Power infrastructure for AGL CMS system
3. Supply & Installation of Structured Cabling network inside DIA AGL Facilities.
4. Installation of AGL CMS equipment

Supply, installation & commissioning of thermal body temperature screening system to Qatar Petroleum

Contract Title Supply, Installation & Commissioning of Thermal
Body Temperature Screening System (20 Nos)
PO No. 576013456
BEQ Job No. Q0095
Client Qatar Petroleum
Commencement Date 25-Mar-20
Contract Period 2 months
Contract Completion Date 25-May-20
Actual Completion Date 25-May-20
Maintenance Support 5 years

PROJECT SCOPE
The scope of work includes supply, installation, and commissioning of Cantronic – FeverScan M3000N Dual Vision Network Thermal Imaging Camera System with following features/components:

• FeverScan M3000N
1. Network real-time accuracy mass fever-scanning
2. Dual Vision (thermal and visual) system for easy screening
3. Pre-definable values for abnormal temperatures
4. Grayscale image using red to indicate high temperatures.
5. Adjustable display palette temperature range
6. Ability to “spot-check” with mouse for accurate crosshair temperature readings
7. Customizable high-temperature alarm
8. Log file records alarm data
9. Turn-key system contains thermal camera head, display software and data acquisition/recording system.

• Thermal Camera
1. Lens: 19mm (FOV: 24o x 18o)
2. Focal Plane Array: Micro-bolometer
3. Image Frequency: 7.5 Hz (NTSC) or 8.3 Hz (PAL)*
4. Spectral Range: 8 — 14 μm
5. Number of Pixels: 324 x 256
6. NETD: 0.05oC @ 30oC
7. Video output: Network digital

• Visual Camera
1. Image Sensor: 1/3″ 1.3 Million Pixel CMOS Sensor
2. Video Frame Output Rate: PAL 25 fps (1280×960)/ NTSC:30 fps (1280×960)

• b. Camera storage up to 30 days
• c. Mobile trolley booth
• d. Uninterruptible Power Supply (UPS) with 30 minutes backup

Upgrade Of Voice Communication System (Vcs) Tmcs System At Hamad International Airport

Contract Title Design, Supply, Installation, commissioning and operational transition of FREQUENTIS voice communication system (VCS) TMCS at HIA

PO No. 2/2019
BEQ Job No. Q0074
Client Qatar Civil Aviation Authority (QCAA)
Commencement Date 18-Apr-19
Contract Period 1 Year
Contract Completion Date 18-Apr-20
Completion Date 10-Feb-20
Maintenance Support 2 Years

PROJECT SCOPE
 Design, Supply, Installation, commissioning, and operational transition of FREQUENTIS voice communication system (VCS) TMCS at HIA