Supply, Installation & Commissioning of Infrared Thermal Body Temperature Screening System at Hamad International Airport

EXECUTIVE SUMMARY

It is a supply and installation project awarded to Bayanat Engineering by Qatar Airways (Hamad international airport). The Description of this Project is to supply and install Infrared Thermal body scanners for passenger screening at Hamad International airport to screen passengers and Staff to reduce the spread of the Virus. The accuracy of the system is very accurate compared to other systems available in the market. The Cantronics System is more stable and reliable in the sense of detection and accuracy.

The Project awarded in March 2020 the project duration was three months and the contractual project completion date is May-2020. However, the Bayanat team completes this Project in 2 months.

The scope of work includes supply, installation and commissioning of Cantronic – Fever scan M3000N Dual Vision Network Thermal Imaging Camera System with following features/components:

Fever Scan M3000N Features:

• Network real-time accuracy mass fever-scanning
• Dual Vision (thermal and visual) system for easy screening
• Customizable high-temperature alarm
• Log file records alarm data
• Thermal Camera
• Visual Camera
• Camera Visuals storage up to 60 days
• Mobile trolley booth
• Uninterruptible Power Supply (UPS) with 30 minutes backup

PROJECT DETAILS

DESCRIPTION DETAILS
LOCATION Hamad International Airport
PROJECT TYPE Supply, Installation & Training
APPLICATION Surveillance & Monitoring
PROJECT DESCRIPTION Supply, Installation and Commissioning of Cantronic – Fever Scan M3000N Dual Vision Network Thermal Imaging Camera System
Client HIA – Qatar Airways
Project Start Date March 8, 2020
Project Completion Date May 31, 2020
Main Supplier Med-Tech / Cantronic, Canada
Project Status Completed

Supply And Installation Of Automatic Rain Gauge

EXECUTIVE SUMMARY

The project is awarded to Bayanat Engineering Qatar by Qatar Civil Aviation Authority (QCAA). It is a supply, testing, and commissioning of Automatic Rain Gauge. We are supplying a total of 50 units (complete set includes Rain gauge, Datalogger, 4G Modem, Solar Panel, and software), which are installed around Qatar for monitoring rainfall and intensity.

The scope of work includes supply, installation and upgradation of following

 50 Units of HyQuest TB6 Rain gauge
 50 Units of HyQuest iRIS270 Data Logger with 4G modem
 50 Units of Rain gauge mounts with solar panel and battery
 Supply and configuration of display software
 Supply and configuration of FTP Server and Workstation
 Testing, Commissioning and Training

PROJECT DETAILS

DESCRIPTION DETAILS
LOCATION Qatar Meteorological Department (Abu-Hamour, Doha)
PROJECT TYPE Supply, Installation & Training
APPLICATION Meteorology
PROJECT DESCRIPTION Supply and Installation of Automatic Rain Gauge
Client QCAA – QMD
Project Start Date April 2019
Project Completion Date November 2019
Main Supplier HyQuest Technologies, New Zealand
Vista Datavision, Iceland
Project Status Completed

Ugradation Of Complete Meteorological Systems Installed At HIA

EXECUTIVE SUMMARY

It was upgradation project awarded to Bayanat Engineering Qatar by Qatar Civil Aviation Authority (QCAA). Major Scope included Upgradation; Improvement of complete meteorological systems installed at HIA. Also, maintenance support for all upgraded systems for the period of 5 years.

The scope includes the following systems upgradation:

 Vaisala AWOS AviMet System (HW & SW Upgrade)
 IBL Weather Forecasting System (HW & SW Upgrade)
 Corobor Weather Monitoring System (HW & SW Upgrade)
 MFI Weather Monitoring System (HW & SW Upgrade)
 Radiometer System (HW & SW Upgrade)
PROJECT DETAILS

DESCRIPTION DETAILS
LOCATION Hamad International Airport
PROJECT TYPE Supply, Installation & Maintenance for 5 Years
APPLICATION Meteorology
PROJECT DESCRIPTION Upgrading complete meteorological systems installed at HIA as per latest standards of ICAO & WMO and maintenance for 5 years
Client QCAA – QMD
Project Start Date June-2018
Project Completion Date On-going (till June-2023)
Main Supplier Vaisala Oyj, Finland
IBL Software Engineering
Corobor Systems, France
MFI Systems, France
Radiometrics Systems, USA
Project Status Active

Design & Build Of Mukaynis Meteorology Center, Qatar

Contract Title Design & Build of Mukaynis Metrology Center
Contract No. 03/2018
Client Qatar Civil Aviation Authority (QCAA)
Contractor Bayanat Engineering Qatar (BEQ)
Commencement Date 1-Sep- 2018
Contract Period 18 months
Contract Completion Date 1-Mar-2020
Actual Completion Date 30-Aug-2019

PROJECT SCOPE
MUKAYNIS METEROLGY CENTER was inaugurated by Qatar Prime Minister H E Sheikh Abdullah Bin Khalifa Al Thani on 12th September 2019. It was a design and build project awarded to Bayanat Engineering Qatar from Qatar Civil Aviation Authority (QCAA). Major Scope included
• Supply, installation, testing & commissioning, and integration of C-band Doppler weather radar
• 42m steel tower with elevator
• Office building and Electrical building
• External and Infrastructure works with related civil/MEP works
The Project duration was 18 months and the contractual project finish date was 1-Mar-2020.
However, BEQ had completed this project and handed over to QCAA within 1 year from project commencement date through the efficient project management & efforts made by BEQ team.
MUKAYNIS Meteorology station was a strategic project as part of Qatar’s FIFA 2022 world cup program which enhance the Qatar’s metrological observation & forecasting operations. The C-Band Weather radar (made by Leonardo Germany) have wide range of features to detect variety of metrological elements in which major are Rain and Wind. In addition, another phenomenon such as.
• Sandstorms
• Microburst
• Gust front
• Tracking of rain cells
• Reverse Sub-catchment (calculation of amount of water accumulated on the ground in a specific area or in a village)
• Warnings by putting threshold of some elements
This Weather Radar has operational coverage of 250KM radius from the radar center and can be extended up to 500KM radius if needed. MUKAYNIS Center is located at central part of Qatar near Salwa road, exit 42

Runway Centreline Lights Upgrade To CAT III At Doha International Airport (Dia)

Contract Title Runway Centreline Lights Upgrade to CAT IIIB at Doha International Airport (DIA)
Contract No. HAB/DIA-RCL/LOI-08/20-1
BEQ Job No. Q00106
Client Honeywell
Commencement Date 20-Aug-20
Contract Period 8 Months
Contract Completion Date 20-Feb-21
Expected Completion Date 20-Feb-21
Defects Liability Period/Warranty Period 24 Months

PROJECT SCOPE
1. Removal of existing runway centreline lights and Installation of new lights in CATIII B configuration
2. Trench works and Manholes for primary & secondary cabling for new Runway lights
3. Asphalt saw cutting works for secondary cable laying
4. Installation of new CCRs
5. Installation of new Illuminated Sign boards
6. Testing & Commissioning Support to Honeywell

Supply & Installation of Automatic Weather Station (AWS310)

EXECUTIVE SUMMARY

This project is awarded to Bayanat Engineering Qatar by Salam Technologies Qatar. The scope includes the supply & installation of the Vaisala-Automatic weather Monitoring system (AWS310) at Qatar Petroleum, Mesaid. The weather elements we monitor through this system is as follows:

 Wind Speed
 Wind Direction
 Atmospheric Pressure
 Precipitation
 Rain Gauge
 Atmospheric Temperature
 Relative Humidity

Vaisala AWS310 is a complete communication and data monitoring solution measuring multiple parameters that satisfies the general and specific needs of several applications, including synoptic, aviation, agricultural meteorology, hydrology, and climatology and even energy industry applications. The ability to use the same standard hardware and software for many different requirements lowers the cost of training, spare parts, and logistics support. When considering the total life cycle cost of operating an entire network, Vaisala systems are the most economical solution. The scope of work will include the supply, installation and testing commissioning of the Weather Monitoring system.

Equipment Includes are follows

a) AWS 310 Base System
b) WXT536 Weather Sensor
c) OTT PLUVIO2 Precipitation Sensor
d) Installation Accessories
e) NM10 Weather Monitoring Software

The Project awarded on February 2020 and the duration is 12 months. The Project is still on-going and expected to complete in October 2020.

PROJECT DETAILS

LOCATION Qatar Petroleum, Mesaid
PROJECT TYPE Supply and Installation
APPLICATION Meteorology
PROJECT DESCRIPTION Supply, Installation, and Testing & Commissioning of Vaisala Weather Monitoring Equipment
Client Salam Technology/Hamad Ports
Project Start Date Feb 23, 2020
Project Completion Date On-Going (till October,2020)
Main Supplier Vaisala Oyj, Finland
Project Status Active

Supply, Installation and Maintenance of VeeLo (ADS-B Transponders)

1. EXECUTIVE SUMMARY

It’s a supply and support project awarded to Bayanat Engineering Qatar by Qatar Airways (Hamad International airport). The main object of this project is to supply, installation and commissioning of Veelo ADS-B Transponders. Also include the preventive and corrective maintenance of transponders. Bayanat Engineering Qatar with his partner SAAB Sensis will provide total quantity of 150 Transponders and installation along with testing and commission of Veelo Transponder is performed by Bayanat Engineering Qatar. Scope of Works includes below mentioned items

Supply, Installation & Maintenance support for the following ADS-B Transponders and related Accessories:
• Vehicle transponder with ADS-B transmitter and GPS receiver – 150 No’s
• Power supply cable with switch to control – Standard 4.6 meter – 150 No’s
• Permanent vehicle mounting accessories – Mounting Bracket – 150 No’s
• Configuration kit for transponder including software CD. – 4 No’s
• Power supply cable with switch to control (medium size) – 9.2m – 50 No’s
• Power supply cable with switch to control (long size) – 15.2m – 50 No’s

PROJECT DETAILS

DESCRIPTION DETAILS
LOCATION Supply, Installation and Maintenance
PROJECT TYPE Supply, Installation and Maintenance
APPLICATION Airport Operations
PROJECT DESCRIPTION Supply, Installation and Maintenance of ADS-B Transponders
Client Qatar Airways/ HIA
Project Start Date July 2017
Project Completion Date On-going (till July 2022)
Main Supplier Saab Sensis Corporation
Project Status Active

Upgrade And Phased Expansion Of Mlat System At Hia

1. UPGRADE AND PHASED EXPANSION OF MLAT SYSTEM AT HIA
1.1 PROJECT DETAILS
Contract Title Upgrade and phased expansion of Multi-lateration (MLAT) system at HIA

Contract No. 06/2019
BEQ Job No. Q0079
Client Qatar Civil Aviation Authority
Commencement Date 1-Sep-2019
Contract Period 16 Months
Contract Completion Date 30-Dec-20
Expected Completion Date 30-Dec-20
Defects Liability Period/Warranty Period 24 Months

1.2 PROJECT SCOPE
Main Scope of works in this project includes.
1. Design, supply, installation & commissioning of new MLAT system and integration with existing MLAT system at HIA.
2. 26 no’s of New MLAT ground stations at different locations inside HIA Airport
3. FO Network infrastructure connecting all the 26 Nos of MLAT ground stations to the head end MLAT cabinet located at ATC building
4. Power infrastructure for all the new MLAT ground stations
5. Any kind of Civil & MEP works required at the concerned facilities required for MLAT installation works.
6. 2 years warranty support for new MLAT system & CLS support for old components
7. Level 1/2/3 Maintenance Support

HIA-Infrared thermal body temperature screening system

It is a supply and installation project awarded to Bayanat Engineering by Qatar Airways (Hamad international airport). The Description of this Project is to supply and install Infrared Thermal body scanners for passenger screening at Hamad International airport to screen passengers and Staff to reduce the spread of the Virus. The accuracy of the system is very accurate compared to other systems available in the market. The Cantronics System is more stable and reliable in the sense of detection and accuracy.

The Project awarded in March 2020 the project duration was three months and the contractual project completion date is May-2020. However, the Bayanat team completes this Project in 2 months.

The scope of work includes supply, installation and commissioning of Cantronic – Fever scan M3000N Dual Vision Network Thermal Imaging Camera System with following features/components:

Fever Scan M3000N Features:

• Network real-time accuracy mass fever-scanning
• Dual Vision (thermal and visual) system for easy screening
• Customizable high-temperature alarm
• Log file records alarm data
• Thermal Camera
• Visual Camera
• Camera Visuals storage up to 60 days
• Mobile trolley booth
• Uninterruptible Power Supply (UPS) with 30 minutes backup

Annual Maintenance for UPS Systems & DOHA HIA Navaids Shelter

It was a Maintenance project awarded to Bayanat Engineering Qatar from Qatar Civil Aviation Authority (QCAA). Major Scope included Maintenance of airfield shelters and the UPS installed in the shelters. Quarterly visits are scheduled for preventive maintenance of UPS and Emergency response was a major part of project, annul maintenance of NAVAIDs shelters which includes painting of shelters.
The detail BEQ Scope include is mentioned below

Maintenance of following UPS systems for 2 years
a) 15KVA 60-NET UPS Chloride (6 Nos.)
b) 20KVA 60-NET UPS Chloride (28 Nos.)
c) 40KVA UPS Emerson (4 Nos.)
d) 60KVA UPS Emerson (2 Nos.)

Annual Maintenance of 17 no’s of Navaids shelters for 2 year
a) Replacement of sealants on joints.
b) Repair of panel cracks or surface peel off
c) Repair and repainting on red surface once in a year
d) Replacement of damaged locks
The Project awarded on November 2016 duration of project was 24 months and the contractual project finish date was September-2018.BEQ had completed this project through the efficient project management & efforts made by BEQ team.