Supply, Installation & Commissioning of Infrared Thermal Body Temperature Screening System at Hamad International Airport

EXECUTIVE SUMMARY

It is a supply and installation project awarded to Bayanat Engineering by Qatar Airways (Hamad international airport). The Description of this Project is to supply and install Infrared Thermal body scanners for passenger screening at Hamad International airport to screen passengers and Staff to reduce the spread of the Virus. The accuracy of the system is very accurate compared to other systems available in the market. The Cantronics System is more stable and reliable in the sense of detection and accuracy.

The Project awarded in March 2020 the project duration was three months and the contractual project completion date is May-2020. However, the Bayanat team completes this Project in 2 months.

The scope of work includes supply, installation and commissioning of Cantronic – Fever scan M3000N Dual Vision Network Thermal Imaging Camera System with following features/components:

Fever Scan M3000N Features:

• Network real-time accuracy mass fever-scanning
• Dual Vision (thermal and visual) system for easy screening
• Customizable high-temperature alarm
• Log file records alarm data
• Thermal Camera
• Visual Camera
• Camera Visuals storage up to 60 days
• Mobile trolley booth
• Uninterruptible Power Supply (UPS) with 30 minutes backup

PROJECT DETAILS

DESCRIPTION DETAILS
LOCATION Hamad International Airport
PROJECT TYPE Supply, Installation & Training
APPLICATION Surveillance & Monitoring
PROJECT DESCRIPTION Supply, Installation and Commissioning of Cantronic – Fever Scan M3000N Dual Vision Network Thermal Imaging Camera System
Client HIA – Qatar Airways
Project Start Date March 8, 2020
Project Completion Date May 31, 2020
Main Supplier Med-Tech / Cantronic, Canada
Project Status Completed

Supply And Installation Of Automatic Rain Gauge

EXECUTIVE SUMMARY

The project is awarded to Bayanat Engineering Qatar by Qatar Civil Aviation Authority (QCAA). It is a supply, testing, and commissioning of Automatic Rain Gauge. We are supplying a total of 50 units (complete set includes Rain gauge, Datalogger, 4G Modem, Solar Panel, and software), which are installed around Qatar for monitoring rainfall and intensity.

The scope of work includes supply, installation and upgradation of following

 50 Units of HyQuest TB6 Rain gauge
 50 Units of HyQuest iRIS270 Data Logger with 4G modem
 50 Units of Rain gauge mounts with solar panel and battery
 Supply and configuration of display software
 Supply and configuration of FTP Server and Workstation
 Testing, Commissioning and Training

PROJECT DETAILS

DESCRIPTION DETAILS
LOCATION Qatar Meteorological Department (Abu-Hamour, Doha)
PROJECT TYPE Supply, Installation & Training
APPLICATION Meteorology
PROJECT DESCRIPTION Supply and Installation of Automatic Rain Gauge
Client QCAA – QMD
Project Start Date April 2019
Project Completion Date November 2019
Main Supplier HyQuest Technologies, New Zealand
Vista Datavision, Iceland
Project Status Completed

Ugradation Of Complete Meteorological Systems Installed At HIA

EXECUTIVE SUMMARY

It was upgradation project awarded to Bayanat Engineering Qatar by Qatar Civil Aviation Authority (QCAA). Major Scope included Upgradation; Improvement of complete meteorological systems installed at HIA. Also, maintenance support for all upgraded systems for the period of 5 years.

The scope includes the following systems upgradation:

 Vaisala AWOS AviMet System (HW & SW Upgrade)
 IBL Weather Forecasting System (HW & SW Upgrade)
 Corobor Weather Monitoring System (HW & SW Upgrade)
 MFI Weather Monitoring System (HW & SW Upgrade)
 Radiometer System (HW & SW Upgrade)
PROJECT DETAILS

DESCRIPTION DETAILS
LOCATION Hamad International Airport
PROJECT TYPE Supply, Installation & Maintenance for 5 Years
APPLICATION Meteorology
PROJECT DESCRIPTION Upgrading complete meteorological systems installed at HIA as per latest standards of ICAO & WMO and maintenance for 5 years
Client QCAA – QMD
Project Start Date June-2018
Project Completion Date On-going (till June-2023)
Main Supplier Vaisala Oyj, Finland
IBL Software Engineering
Corobor Systems, France
MFI Systems, France
Radiometrics Systems, USA
Project Status Active

Foreign Object Debris Detection System For Hamad International Airport

EXECUTIVE SUMMARY

Bayanat Engineering Qatar (BEQ), in partnership with Xsight is pleased to present the RunWize™, the Intelligent Hybrid Dual Sensor based Runway Surveillance and Foreign Object & Debris (FOD) Detection System as the Runway Debris Monitoring System (RDMS) for HamadInternational Airport.

The scope of this project involves the design , supply, installation, commissioning and support of :

• A debris detection ,location and identification subsystem
• An alert , display , logging and archiving subsystems

Our scope of work is to design, supply, deliver, install, test, commission, implement and support the Foreign Objects Debris (FOD) Detection System for Runways at Hamad International Airport as a turnkey project inclusive of; Field Sensor units, Application and Analytical software , Infrastructure works , relevant Civil works and 5 years maintenance support services meeting the contract requirement.

We have proposed Xsight System solution RunWize as the Foreign Objects Debris (FOD) Detection System which is intelligent and automated FOD detection system, with primary means of detection, location and identification of debris, primary sensor by the radar system and with the camera(s) to zoom / focus on the debris and for survelliance.

The proposed Xsight sensors were designed to be very similar to edge light in how it is installed and maintained. No special runway closures are required to install and maintain the system. System installation and maintenance shall be performed during the standard runway maintenance window providde by HIA.

RunWize™ is a Dual Hybrid FOD detection system, providing real‐time, automated FOD detection,location, identification, classification and logging. It can be deployed in civil airports as well as military airbases, helping to prevent potential aircraft damage and fatalities caused by FOD. The
airports it has been deployed in include Ben‐Gurion Airport (TLV) in Tel‐Aviv, Boston Logan International Airport (BOS), Suvarnabhumi International Airport Bangkok (BKK), Seattle‐Tacoma International Airport (SEA) and Beijing Capital International Airport (BCIA). It is imperative to
highlight that RunWize™ is the only automated FOD detection system that has been commercially installed in a U.S. Airport

PROJECT DETAILS

Coverage Area: The proposed system will provide FOD detection on both Runways of Hamad International Airport, providing 100% coverage of RWY16L/34R and RWY16R/34L till Runway threshold/end, including all taxiways and rapid exit taxiways up to the CAT I holding position, as shown below.

Reconfiguration Of The Emergency Lighting Control System At Backup Atc Tower Building, Hia Airport

Contract Title Reconfiguration of the Emergency Lighting Control System at Backup ATC Tower Building, HIA Airport
PO No. 3/2018 VO1
BEQ Job No. Q0086
Client MICRONAV LIMITED UK
Commencement Date 2-Nov-19
Contract Period 1 Month
Contract Completion Date 2-Dec-19
Completion Date 2-Dec-19

PROJECT SCOPE
 Reconfiguration of the Emergency Lighting Control System at Backup ATC Tower Building, HIA Airport

Supply, Installation And Configuration Of Weather Radar (Rainbow) User Workstations

Contract Title Supply, installation, and configuration of Weather Radar Rainbow user workstation (DART)
PO No. 3/2018
BEQ Job No. Q0068 VO1
Client Qatar Civil Aviation Authority (QCAA)
Commencement Date 29-Aug-19
Contract Period 1 month
Contract Completion Date 29-Aug-19
Completion Date 29-Sep-19
Maintenance Support 1 years

PROJECT SCOPE
 Supply, installation, and configuration of Weather Radar rainbow user workstation (DART) (6 Nos) at Qatar Meteorological Department Facilities

Design & Build Of Mukaynis Meteorology Center, Qatar

Contract Title Design & Build of Mukaynis Metrology Center
Contract No. 03/2018
Client Qatar Civil Aviation Authority (QCAA)
Contractor Bayanat Engineering Qatar (BEQ)
Commencement Date 1-Sep- 2018
Contract Period 18 months
Contract Completion Date 1-Mar-2020
Actual Completion Date 30-Aug-2019

PROJECT SCOPE
MUKAYNIS METEROLGY CENTER was inaugurated by Qatar Prime Minister H E Sheikh Abdullah Bin Khalifa Al Thani on 12th September 2019. It was a design and build project awarded to Bayanat Engineering Qatar from Qatar Civil Aviation Authority (QCAA). Major Scope included
• Supply, installation, testing & commissioning, and integration of C-band Doppler weather radar
• 42m steel tower with elevator
• Office building and Electrical building
• External and Infrastructure works with related civil/MEP works
The Project duration was 18 months and the contractual project finish date was 1-Mar-2020.
However, BEQ had completed this project and handed over to QCAA within 1 year from project commencement date through the efficient project management & efforts made by BEQ team.
MUKAYNIS Meteorology station was a strategic project as part of Qatar’s FIFA 2022 world cup program which enhance the Qatar’s metrological observation & forecasting operations. The C-Band Weather radar (made by Leonardo Germany) have wide range of features to detect variety of metrological elements in which major are Rain and Wind. In addition, another phenomenon such as.
• Sandstorms
• Microburst
• Gust front
• Tracking of rain cells
• Reverse Sub-catchment (calculation of amount of water accumulated on the ground in a specific area or in a village)
• Warnings by putting threshold of some elements
This Weather Radar has operational coverage of 250KM radius from the radar center and can be extended up to 500KM radius if needed. MUKAYNIS Center is located at central part of Qatar near Salwa road, exit 42

Hia Western Area Taxiways & Stand Development Works – Mlat & Met Package

Contract Title HIA Western Area Taxiways & Stand Development Works– MLAT & MET Package
Contract No. UBTJV-SCA-047
BEQ Job No. Q0096
Client UBT JV
Commencement Date 17th June 2020
Contract Period 12 Months
Contract Completion Date 17th June 2021
Expected Completion Date 17th June 2021
Defects Liability Period/Warranty Period 24 Months

SCOPE OF WORK
Main Scope of works in this project includes.
• Design, supply, installation, and commissioning of MLAT Equipment
‒ Supply & Installation of 9 Nos of new MLAT Ground Stations
‒ Relocation of existing MLAT Ground Station near west runway
‒ Integration of new MLAT sensors with existing MLAT system, Testing & commissioning
• Relocation of MET Equipment
‒ Supply and Installation of new RVR16R Shelter
‒ Weather Station (MET shelter and mast) including supply and installation of soil temperature sensors (6 no’s)
‒ LT31 RVR 34L Transmitter and receiver
‒ LAP3000 Wind profiler including OEM Testing and Commissioning
• Design, supply, installation, and commissioning of Fiber network at HIA western expansion area for CNS/Navaids services

Runway Centreline Lights Upgrade To CAT III At Doha International Airport (Dia)

Contract Title Runway Centreline Lights Upgrade to CAT IIIB at Doha International Airport (DIA)
Contract No. HAB/DIA-RCL/LOI-08/20-1
BEQ Job No. Q00106
Client Honeywell
Commencement Date 20-Aug-20
Contract Period 8 Months
Contract Completion Date 20-Feb-21
Expected Completion Date 20-Feb-21
Defects Liability Period/Warranty Period 24 Months

PROJECT SCOPE
1. Removal of existing runway centreline lights and Installation of new lights in CATIII B configuration
2. Trench works and Manholes for primary & secondary cabling for new Runway lights
3. Asphalt saw cutting works for secondary cable laying
4. Installation of new CCRs
5. Installation of new Illuminated Sign boards
6. Testing & Commissioning Support to Honeywell

Supply and Installation of AWOS Frangible Wind Mast at HIA

EXECUTIVE SUMMARY

It is Infrastructure upgrade project awarded to Bayanat Engineering by Qatar Civil Aviation Authority (QCAA). The title of this project is supply and installation of tilt able AWOS wind mast. The work is composed of removing the existing frangible mast installed in the five locations of the HAMAD INTERNATIONAL AIRPORT and Install new tilt able frangible mast. During these two unique activities, removal and re-installation of the existing related sensors and accessories will also be executed as integral part of the work activities. The scope of work connected in the replacement of the existing AWOS frangible wind mast in Hamad International Airport is consist of 2 parts:

A. Removal of the existing AWOS frangible wind mast located in GP 34R. GP16L, GP 34L, GP16R and MET Garden.
B. Installation of new AWOS frangible wind mast with a tilt able capability

The upgraded tilt able AWOS frangible mast is one possible easing to do the corrective maintenance on the sensors and accessories. This will take less time to work near the runway strip area, which means fewer safety hazards.

PROJECT DETAILS

DESCRIPTION DETAILS
LOCATION Hamad International Airport
PROJECT TYPE Infrastructure
APPLICATION Meteorology
PROJECT DESCRIPTION Supply & Installation of Frangible Automated Weather Observing System Wind Masts at Hamad International Airport
Client QCAA-QMD
Project Start Date April 2020
Project Completion Date On-going (till April,2021)
Main Supplier Vaisala
Project Status Active