EXECUTIVE SUMMARY
It is Infrastructure upgrade project awarded to Bayanat Engineering by Qatar Civil Aviation Authority (QCAA). The title of this project is supply and installation of tilt able AWOS wind mast. The work is composed of removing the existing frangible mast installed in the five locations of the HAMAD INTERNATIONAL AIRPORT and Install new tilt able frangible mast. During these two unique activities, removal and re-installation of the existing related sensors and accessories will also be executed as integral part of the work activities. The scope of work connected in the replacement of the existing AWOS frangible wind mast in Hamad International Airport is consist of 2 parts:
A. Removal of the existing AWOS frangible wind mast located in GP 34R. GP16L, GP 34L, GP16R and MET Garden.
B. Installation of new AWOS frangible wind mast with a tilt able capability
The upgraded tilt able AWOS frangible mast is one possible easing to do the corrective maintenance on the sensors and accessories. This will take less time to work near the runway strip area, which means fewer safety hazards.
PROJECT DETAILS
DESCRIPTION DETAILS
LOCATION Hamad International Airport
PROJECT TYPE Infrastructure
APPLICATION Meteorology
PROJECT DESCRIPTION Supply & Installation of Frangible Automated Weather Observing System Wind Masts at Hamad International Airport
Client QCAA-QMD
Project Start Date April 2020
Project Completion Date On-going (till April,2021)
Main Supplier Vaisala
Project Status Active